With the first of four phases opening to students in the fall of 2022, the BASIS Bellevue project is gently tucked into the surrounding trees and organized around terraced gathering and play space. On the inside, vaulted ceilings and generous windows provide natural light and unifying campus views to all classrooms.
BASIS PreK-12 School
Bellevue, Washington
2022
2022